Interested in a product? Get in touch to request a call back.

Solar Panel Installation

As part of the continuous effort to reduce our carbon footprint we are pleased to announce the installation of 837 solar panels at our Peterborough road production site. The 238 KWP system will significantly reduce our dependence on energy from the national grid. Supplied and installed by Watt Energy Saver the system will go live in August of 2019.

Share this post